ASSEMBLY BRISTOL

MADE FOR THE CITY

Assembly is where it all comes together. Prime waterfront position and city centre location. Beautiful landscaping and abundant outdoor spaces. Fresh perspectives and stunning rooftop views. Flexible floorplates and natural light. Sustainable design and genuine wellbeing focus. A vibrant community and a connected future. It’s a truly unique workplace for our city, made for the people and made for Bristol.

Building C, the second of three new state-of-the-art workplaces, has now completed with three of twelve office floors already occupied. Building B completes in April 2024, with availability up to 28,000 sqft, and Building A is fully occupied by BT as their new South West Hub.

Assembly Bristol linedrawing 0720 2 A Assembly Bristol linedrawing 0720 2 B Assembly Bristol linedrawing 0720 2 C

Building A

Availability

LET TO BT

Completion

July 2021

Assembly’s first phase completed in July 2021. Building A is let in its entirety to BT as part of their ‘Better Workplace Programme’. The building is now open with the first of 2,500 staff already in.
View Building

Building B

Availability

28,216 SQ FT

Completion

April 2024

Building B is arranged over 7 levels with office availability from 1,700 sq ft for ground floor, whole upper floors of 4,500 & 2,700 sq ft and entire building of 28,000 sq ft for a single occupier.
View Building

Building C

Availability

65,700 SQ FT

Completion

Dec 2023

Building C completed at the end of 2023. Three of its twelve office floors are occupied with current availability from 3,000 to 65,700 sq ft. It has exterior balconies on every level, with full-height windows providing natural light and spectacular views across the city.
View Building

Why wellbeing matters

At Assembly, staff wellbeing has been designed in. See how BT's staff are already feeling the benefits in this short film.

Find out more

Perfectly located

Assembly’s central location ensures excellent transport links. Temple Meads station is just five minutes walk away, offering regular services to London and the rest of the UK.

Find out more

Made for the Future

Throughout the design process, sustainability has been a crucial consideration, and Assembly’s impeccable green credentials promise more efficient running costs for occupiers.

Made for the People

Find out what you can expect from the Workplaces at Assembly - from the people themselves.

Find out more

Latest

latest news
NEWS Earlier this week, Assembly Building C launched with an event for agents and tenants. The launch event was themed around... Read more
latest news
NEWS Assembly’s Building C reception offers something different and unique to the rest of the Bristol office market: removing the traditional... Read more
arrow-downarrow-downloadarrow-downloadarrow-leftarrow-rightarrowaxabell-hammerBuilding ABuilding BBuilding Cburgerchevron-leftchevron-rightchevronclosecompassjlllogo-iconlogologo-textsavillssubmittick